Home / Staff / Academic Staff /

Chief Assist. Prof. Dr. Eng. Vladimir Popov

Faculty of Transportation Engineering, Railway Construction

Chief Assist. Prof. Dr. Eng. Vladimir Popov
Office Room 750
Phone 9635245/576
E-mail vpopov.fte@gmail.com
Marital Status married

Lectures

Railway design, station design, superstructure design, CAD in transport engineering - Programs used in development of transport designs course - Land Development Desktop, Civil 3D, InRail Suite

Education

1995 - 2001

Institutions: University of Civil Engineering and Geodesy, dep. Railway Construction
Degree: Civil Engineer - Master Degree in Railway construction

Language Skills

Language - Passive, Spoken, Written
English, Russian

Science Interests

[list]Railway and metro projects designer
Reconstruction and upgrading of railway track
Road projects designer
Railway station
Chainage and benchmarking of the track[/list]

Participation in Design Projects

Cadastral survey of Strumiani, Sandanski, Cherniche, Simitli Kresna, Pejo Yavorov, General Todorov, Kulata railway stations. Digitalizing and preparation of drawings of railway stations along Railway № 5
Preparation of preliminary designs and options for the railway freight to track container sites in zh.k.Levski-Sofia.
Project for new railway track "Temira" Ltd.
Vertical planning and road projects.

Preparation of technical design:
RECONSTRUCTION AND ELECTRIFICATION of the railway line Plovdiv-Svilengrad - Turkish / Greek border and the route OPTIMIZATION FOR SPEED 160 km/h (200 km/h).

http://www.plovdivsvilengradrailway.com/en/

Design and optimization of the preliminary design of 160km. highway railway
Optimization and preparation of technical projects for railway stations for speed 160 km / h. (200 km / h):
st.Katunitsa, st.Popovitsa, st.Parvomay, st.Dimitrovgrad, st.Simeonovgrad, st.Harmanli, st.Lyubimets, Border st.Svilengrad, st.Kapitan Andreevo
Preparation of technical projects of 20 halts.

Technical designs for rehabilitation of fourth-class roads in Radnevo municipality – 30km
Road-50 041 from km 3+000,00 to km 14+680,00
Road-57 008 from km 3+900,00 to km 9+258,13
Road-57 012 from km 0+000,00 to km 3+188,88
A street in the Znamenosec village from km 0+000,00 to km 0+399,98
Road-57 014 from km 0+000,00 to km 1+981,54
A street in the Radnevo city from km 0+000,00 to km 0+556,03
Road-57 004 from km 0+000,00 to km 7+363,67
Development of preliminary design of temporary construction roads at the Tzankov Kamak dam
Technical design for alignment and level optimization of the Dragoman – Kalotina railroad – 15 km.
Design for a new railway for “Temira LTD” - lq. “Novi Iskar” ,Sofia. Vertical levelling of loading platform.

Development of preliminary and definitive design of a railway under the project “Freight station for inert materials in Krum village (city of Dimitrovgrad) for “Kaolin” Joint-stock company
Implementation of technical design “Freight station in Dobrich for concrete elements produced by YTONG Bulgaria
Consulting design for railway station for Mersk BG
Consulting works under the Sofia Metro extension project, contractor Taisei Corporation
Development of a preliminary design for ferryboat link Silistra - Kalarash

Development of a definitive design for a railway on a concrete slab - “Zlatna Panega” cement factory

Development of design for 12 subprojects under the project “Emergency repairs and consolidation of weak zones” along the Bulgarian railway network . Clint: NRIC


Rail Corridor II:
- km 331+522 Asenovo railway station - drainage system and dikes
- from km 339+800 to km 340+100 (Asenovo - Slavianovo ) - design for darainage system and consolidation of landslides.
- km 341+150 - design for darainage system and consolidation of landslides.
- km 359+300 - Svetlen village - design for darainage system
- Popovo - development of 3D model for the reconstruction of a railway bridge
Rail Corridor IV:
- km 141+500 - Debelec - Sokolovo - design for darainage system and consolidation of landslides.
- km 153+050 - Ganchovec village - design for drainage system
- km 158+000 - Drianovo station - design for darainage system and consolidation of landslides.
- from km 162+000 to km 165+000 - design for darainage system and consolidation of landslides.
km 166+000 - Tzareva Livada station - design for darainage system

Preliminary and detailed design for Phase 1 "KRUMOVO - PARVOMAY, km 164+575.00 - km 202+300.00" first railway. "ELECTRIFICATION AND UPGRADING THE RAILWAY LINE PLOVDIV - SVILENGRAD CORRIDORS IV AND IX” , Contractor - Terna.

Preliminary designs for the project "Intermodal Terminal - Sofia" in cooperation with Feybar Mansel. Parts: geodesy, geology, rail, constructions (container site), roads.

 

Preliminary and technical design for rehabilitation and reconstruction under the project "Technical assistance for rehabilitation of railway infrastructure along sections of the railway line Mezdra - Gorna Oryahovitsa in Bulgaria." – total length 125 kilometers. Preparation of 3D terrain and railway model, geodesy and geology surveys. Consortium with "TRANS EL Engineering SP", "SUDOP PRAHA", "GETINSA", "SYSTRA".Design speed 130km/h.


Preliminary and detailed design for "PARVOMAY - SVILENGRAD, km 202+300.00 – km 298+800.00 " PHASE 2 in section 202+300 to 253+700. Part of "ELECTRIFICATION AND UPGRADING OF THE RAILWAY LINE PLOVDIV - SVILENGRAD OF CORRIDORS IV AND IX''
Contractor - Astaldi. Design speed 160km/h (200km/h).

Preparation of preliminary and detailed design for railway line "Svilengrad – Turkish border” Builder- "OHL - ZS". Design speed 160km/h (200km/h).

Conceptual design of the railway line Radomir - Kyustendil Station - Station Gyueshevo – total length – 75 kilometers. Covering the sixth main railway line, of the – VIII-th railway corridor. Design speed 160km/h (200km/h).

Preliminary design of railway line Sofia-Elin Pelin, Elin Pelin-Ihtiman, Ihtiman-Septemvri. Total lenght of 97 kilometers. Design speed 160km/h (200km/h).
 

Academic Positions

2005 -2006 Sofia, UACEG, University Assistant

Science Keywords

Railway Projects Designer

Other Posts and Activities

Manager at "Infra Pro Consult" LTD

Study materials



Типови напречни профили
инж.Владимир Попов




Coursework ans assignments



Геодезия - Задания 2023
Карти със задания

Examination rules

Правила за провеждане на упражненията
Календарен план, изисквания за заверка и оценка


Information



Photo Gallery

  • Дилатационно устройство
  • Контра релси при мост
  • Устройство за омасляване. Разполага се преди гърловините на гарите. При преминаване на колерата смазката се разнася по релсите на гарата.
  • Вагоноизхвъргачка
  • Бретел
  • Английска стрелка
  • ЗОП-Земна основна площадка
  • ОП-Основна площадка (120MPa)
  • ЖП Кантар
  • Кофраж за траверси
  • Нарязване на отделните траверси
  • Армировка на траверси
  • Пешеходен прелез
  • Траверси със скрепления
  • Наклоноуказател
  • Релси
  • Подмяна на горно строене
  • Отводнителни канавки тип
  • Защитна стена от габиони
  • Отводнителни улеи при пешеходни подлези
  • Рампа за хора в неравностойно положение
  • Склапящ се перон.
  • Шумозащитна стена с прозрачни панели
  • Защитна мрежа за птица на АМ
  • Траверси B91
  • Полагане на горното строене на място
  • Добаластиране
  • Гъвкава дренажна тръба
  • Ревизионна шахта за дренажа
  • Строителства на предпазно съоръжение при пресичане на въжена линия