Water - Power Stations and Pumped - Storage Power Stations - Project Assignment
Major | |
---|---|
Faculty | Faculty of Hydraulic Engineering |
Department | Hydraulic, Irrigation and Drainage Engineering |
Lead Lecturer | Assoc. Prof. Dr. Eng. Dimitar Kisliakov |
The course project in WPP and PSPP consists of the following parts: selection of turbine and generator equipment for a WPP, construction of the operational hill charts for the turbine, analysis of the waterhammer and the unit runaway due to its emergency shut-down, dimensioning of a continuous reinforced beam of the gantry crane in the powerhouse, preliminary dynamic analysis of the generator foundation. Two laboratory exercises are also carried out: demonstration of the operation modes of WPP and PSPP, and recording of part of the hill chart of a Pelton turbine.